iii Startup and Commissioning Phase:
Contact Us
Operational Information
Resources
What is Combined Heat & Power?
i Project Planning Phase
About EMMC
Lessons Learned
Project Approach
Project History
Project Team
ii Engineering and Construction Phase
Basis of Design
Conceptual Design Drawings
Equipment Procurement Approach
Project Management Approach
Project Schedule and Milestones
iii Startup and Commissioning Phase
Equipment
Factory Witness Testing Reports
Lessons Learned
Operator Training and Plant Handover
Plan and Key Steps
Project Close-Out
Standard Operating Procedures
Equipment
-
Solar Turbine Generator (Centaur 50)
Neutral Ground Resistor
Combustion Air Ducting
Silencer
Air-Oil Lube Cooler
Load Shed Panel
Duplex Enclosure Fan
Customized Tank with Flame Arrestor
Deltak HRSG/Diverter/Stack
Square D Electrical Gear/Unit Substation/Motor Control Center
ASCO Transfer Switch
Honeywell Controls & EBI Building Management System
Air Tank/Desiccant Dryer Package
Instrument and Control Valves
Switchgear/Relay
Gas Heat Exchanger/Filter
Turbine Generator Ventilation Air Ductwork and Expansion Joints
Ventilation Fans/Louvers
Valve Package
Trane 500 Ton Steam Absorption Chiller
Marley Cooling Towers
© Eastern Maine Medical Center 2009 | 489 State St, Bangor, ME, 04401 | (207) 973-7000 |
Phone Directory
|
Directions to EMMC